Referendum 2022 Updates

We are so very grateful for the passage of the November 2022 Referendum.  Stay up-to-date on the latest regarding the 2022 referendum projects. 


April 2025 Update

King Elementary and Lombardi Middle School Clean Energy Award

The Green Bay Area Public School District was recently honored with a 2024 Clean Energy Honor Roll award for its clean energy efforts by RENEW Wisconsin. The organization recognized the District's clean energy impact thanks to solar projects at Lombardi Middle School and King Elementary School.

The Green Bay Area Public School District's solar projects, installed by McKinstry, demonstrate how clean energy solutions can empower schools to save money, reduce environmental impact, and foster educational opportunities. The GBAPS clean energy initiative resulted in several notable achievements for the district, specifically at Lombardi Middle School and King Elementary School. The installation of two rooftop solar PV arrays will reduce greenhouse gas emissions by 588,150 pounds of CO2e annually and lower energy costs by $29,400 annually. The school district also created STEM-focused learning opportunities for students, integrating renewable energy data into the curriculum to inspire the next generation of sustainability leaders. 

- Sam Dunaski

Executive Director, RENEW Wisconsin

The solar panels, which were completed thanks to community support of the November 2022 referendum, offset nearly 50% of the annual electrical energy load at Lombardi, and nearly 100% of the annual electrical energy load at King.

King Elementary roof with solar panels. Green grass in the background.
Lombardi roof with solar panels. Trees, a street and homes in the background

February 2025 Update

Rectangular Rapid Flashing Beacons (RRFB) in School Zones

Rectangular Rapid Flashing Beacons (RRFB) with high visibility crosswalks have been installed at 48 locations across the City of Green Bay. This project was completed in partnership with the City of Green Bay’s American Rescue Plan Act (ARPA) funding and November
2022 Referendum dollars. RRFBs are proven to enhance pedestrian safety by reducing crashes by up to 47% and increasing motorist
yielding rates by up to 98%.

The RRFB project follows the work of the Safe Walk & Bike Plan, which was a joint effort between the Green Bay Area Public School District and the City of Green Bay. The purpose of the initiative is to empower adults and children of all ability levels throughout Green Bay to make walking and biking part of their daily routines and enable them to get to school and other local destinations in a safe and equitable way. RRFB locations were selected based on proximity to schools, crash data, roadway information, and community feedback.

The Green Bay Area Public School District is proud to have partnered with the City of Green Bay to make our community safer for all pedestrians, but especially for our students who walk to and from school each day.

Phase two of implementation will involve the completion of several more enhanced crosswalks, as well as the installation of speed feedback signs in and around school zones within the community.


January 2025 Update

Preble High School Auditorium Update

We're seeing progress at Preble High School thanks to the November 2022 Referendum! Renovations of the auditorium are coming along with new seats and new carpeting added. New technology was implemented to give both the students and audience the best experience. The project in its entirely updated and/or renovated the following:

  • Microphones & sound system
  • Stage lighting 
  • Stage floor refinish
  • Sound and lighting booth
  • Chairlift to the upper control booth
  • Above ceiling catwalks
  • Audience seating
  • Lighted aisle strips
  • Acoustic wall finishes
  • Orchestra pit railing, floor & wall finishes
  • LED house lighting
  • ADA unisex toilet room

Click the photos below to see full-sized images.

Wooden panels in new Preble auditorium
Rows of green seats in the auditorium viewed from the stage
Full view of the auditorium house from the state. Green seats fill the auditorium
Green seating in the auditorium
Green curtain on stage
Green curtain view from the ground
Green seating in the auditorium
Green seating in the auditorium
Wooden panels in new Preble auditorium
Green seating in the auditorium
Wooden panels in new Preble auditorium
Wooden panels in new Preble auditorium
View from the middle and left side of the auditorium
View of catwalk and light grid from the ground
View of catwalk and light grid from the ground

December 2024 Update

West High School Auditorium Update

We're seeing progress at Green Bay West High School thanks to the November 2022 Referendum! Renovations of the auditorium are coming along with new seats and new carpeting going in. Historic elements continue to be preserved as new technology is implemented to give both the students and audience the best experience. The project in its entirely updated and/or renovated the following:

  • Microphones & sound system
  • Stage rigging, curtains
  • Stage lighting
  • Motorized light hoists
  • New LED house lighting
  • Above ceiling catwalks
  • New seating
  • Lighted aisle strips
  • New floor finishes
  • Complete paint/plaster renovation of the 1927 walls and ceilings
  • Balcony painted with International Baccalaureate (IB) subject group symbols
  • Climate controlled room for piano storage
  • Backstage monitors
New blue and wood seats at the back of the West High School auditorium
New pastel toned carpeting is laid at the back of the West High auditorium.
Rows of new black, blue and wood seats line the renovated West High Auditorium. Blue paint and artwork covers the balcony, with repairs to the wooden ceiling and original light fixtures
Rows of new black, blue and wood seats line the renovated West High Auditorium
New seats line the newly renovated West High auditorium. Blue paint lines the underside of the balcony.
Original stone details and light fixtures remain in the West high school auditorium.
Original, repaired woodwork and light fixtures decorate the ceiling in the West High auditorium.
Blue seats with wooden arms face the state in the newly renovated West High auditorium.
Rows of new black, blue and wood seats line the renovated West High Auditorium
New but historically relevant art lines the inserts on the balcony.
New but historically relevant art lines the inserts on the balcony.
Blue and black seats with wooden arms.
Rows of new black, blue and wood seats line the renovated West High Auditorium
A view into the auditorium from the right side of the house into the newly renovated West High auditorium.
Wooden beams and and art work are preserved.

November 2024 Update

Preble High Commons and Auditorium Update

We're seeing progress at Green Bay Preble High School thanks to the November 2022 Referendum! Renovations of the auditorium continue, as well as the addition to the Preble commons and second floor classrooms. Here's a sneak peak at the updates.

Preble auditorium construction - concrete floor with seats removed - light colored wooden wall treatment is up
View of the stage from the back of the under construction Preble auditorium - concrete floor with seats removed - light colored wooden wall treatment is up
Preble Commons exterior with P emblem in stone work
Work on the expansion of the Preble commons with windows facing the new stadium.
Work on the expansion of the Preble commons with windows facing the new stadium.
Work on the expansion of the Preble commons with windows facing the new stadium.
Work being done on the second floor where classroom space is being added above the Preble commons.
Work being done on the second floor where classroom space is being added above the Preble commons.
Work being done on the second floor where classroom space is being added above the Preble commons.

Danz Park Playground Completed

Green Bay Area Public Schools and City of Green Bay leaders gathered with students and staff to celebrate the new ADA compliant and inclusive playground at Danz Elementary School on November 8, 2024. Danz Elementary Principal Kelly Agen said the anticipation of the new playground has students stopping her in the hallway to share their gratitude for the new playground.

Danz playground is the fifth ADA-compliant and inclusive playground installed in the Green Bay Area Public School District and the third for the City of Green Bay parks system. The project was made possible thanks to community support of the November 2022 referendum and through City of Green Bay ARPA funds.

See photos from the ribbon cutting and read more about the new playground here.

 

October 2024 Update

Sullivan Park Playground Completed

Green Bay Area Public Schools and City of Green Bay leaders gathered with students, staff, and families to celebrate the new ADA-compliant and inclusive playground at Sullivan Elementary School on October 25, 2024. Sullivan Principal Tanya Fenner said this new space provides an area where all children can play together in a welcoming environment. 

Sullivan Park is the fourth ADA-compliant and inclusive playground installed in the Green Bay Area Public School District and the second for the City of Green Bay parks system. The project was made possible thanks to community support of the November 2022 referendum and through City of Green Bay ARPA funds.

See photos from the ribbon cutting and read more about the new playground here.

 

September 2024 Update

Green Bay West High School Stadium Debut

Green Bay West High School unveiled its newly renovated stadium for the Homecoming football game on September 20, 2024. See the stadium, the marching band and the fans in this video. The video on the right show a renovation and construction timeline of the stadium.

 

 

 

Edison Middle School Auditorium Complete

The renovation of the Edison Middle School Auditorium is complete!  Click on the photos below to view a larger version.

Edison Auditorium new seats are red and black. Gray carpeting lines the walkways.
Edison Auditorium new seats are red and black. Gray acoustic panels cover wood details.
Edison Auditorium new seats are red and black. Gray carpeting lines the walkways.
Edison Auditorium new seats are red and black.
Edison Auditorium new seats are red and black. Gray acoustic panels cover wood details.
Edison Auditorium new seats are red and black. Gray acoustic panels cover wood details.
Edison Auditorium new seats are red and black. Gray carpeting lines the walkways.
Edison Auditorium new seats are red and black with gold number plates.
Edison Auditorium new seats are red and black. Gray carpeting lines the walkways.
Edison Auditorium new seats are red and black with gold number plates.

Green Bay West High School Weight Room Reveal

The new Green Bay West High School weight room is here! Students started using the space in mid-September and the reactions speak for themselves. Check out the student reactions and a quick tour of the space.

 

 

August 2024 Update

Edison Middle School Auditorium Update

With a new coat of paint on the walls and new seats in, the Edison Middle School auditorium is looking sharp! Click on the photos below to view a larger version.

Edison Auditorium new seats are red and black
Edison Auditorium new seats are red and black
Red Edison seats in auditorium

Aldo Leopold Community School Playground Completed

The playground is complete! The Green Bay Area Public School District’s Aldo Leopold Community School ADA compliant and inclusive playground is the third in the District, joining Baird and Jackson Elementary Schools. This playground was designed with help from Aldo Leopold students.

A ribbon cutting will be held on August 21, 2024 at 4 p.m. to celebrate with students, families and staff.

West High School Stadium Updates

Turf has been installed at the stadium, as construction continues on the restrooms and concession area. We can't wait to see our students out on the field later this fall! It is anticipated that the stadium construction will have progressed to allow West High School to host its homecoming game on September 20th. The goal is to have the restrooms and concession area completed at that time.

 

July 2024 Update

Baird Elementary ADA Compliant Playground

Baird Elementary School saw a major upgrade this summer, thanks to the 2022 Referendum! The previous playground was moved from the old Baird Elementary school site to the new Baird Elementary School back in 2019. This new replacement playground has more equipment and is ADA compliant, with a turf base, meeting the needs of more of our students! This project and many others were made possible thanks to community support of the 2022 Referendum.

Lombardi Middle School and King Elementary School LED Lighting and Solar Panels

Lombardi Middle School and King Elementary School are seeing some updates! Work is currently being done at both schools to upgrade LED lighting. Ceiling grid, ceiling tiles, and HVAC supply diffusers were replaced as necessary to accommodate the new LED lighting. On the exterior, solar panels are being added to both roofs for additional energy efficiency. All of this work is thanks to community support of the 2022 referendum. Click on the photos below to view a larger version.

King Elementary roof with solar panels being added. Green trees and blue sky in background, with parking lot with cars in the foreground
Lombardi roof being prepped for solar panels. Green grass, trees and the track are in the background.
New LED lights and ceiling grid in hallway at Lombardi
New LED lights and ceiling grid in hallway at Lombardi

Preble High School Commons and Stadium Updates

Work is well under way on the Green Bay Preble High School commons and classroom addition. Plus, the stadium renovations are nearly complete. The grandstand, concession stand, and bathrooms are nearly ready for the upcoming fall sports season. Stadium upgrades and the commons renovation at Preble High School are just a few of many projects to come from the November 2022 Referendum. 

West High School Stadium and Roofing

Stadium renovations, roofing work and construction of the new weight room and wrestling space continues at West High School.

Aldo Leopold Community School Playground

We're seeing big changes at Aldo Leopold Community School! Crews are hard at work on a new playground, thanks to community support of the 2022 referendum. We're excited to see students enjoying the new playground this fall!


June 2024 Update

East Weight Room and Tennis Courts

Progress is being made on the new weight room and fitness center at Green Bay East High School! The tennis courts are also seeing a facelift.

Preble Commons and Classroom Addition

We're getting a glimpse at the future Preble High School commons and classroom addition. This project will progress over the summer and continue into the beginning of the 2024-2025 school year. Click on the photos below to view a larger version.

Renderings of the future Preble commons with lunch tables and green and yellow columns.
Interior renderings of the Preble commons.
Exterior rendering of the Preble commons.

May 2024 Update

Southwest Baseball and Softball Complex Ribbon Cutting

Students, staff and community members celebrated the new Baseball and Softball Complex at Southwest High School with a ribbon cutting on May 2, 2024. 


April 2024 Update

West Del Marcelle Stadium Groundbreaking

Students, community members and local officials gathered on April 29, 2024, to break ground on the Del Marcelle Stadium renovations at West High School. The renovations include new synthetic turf, a practice field, restrooms, concession stands, grandstand, press box, scoreboard, storage shed, sound system, and lighting.

The project is set to be complete for the 2024-2025 fall sports season.

Aldo Playground Renderings

Renderings of the future playground at Aldo Leopold Community School have been created, and we're now getting a glimpse into what the playground may look like upon completion.

Aldo Playground Rendering 4
Aldo Playground Rendering 3
Aldo Playground Rendering 2
Aldo Playground Rendering 1

Southwest Baseball and Softball Complex

Baseball and Softball diamonds are officially in use at Southwest High School! Southwest High School varsity baseball coach Matt Rukamp wants to thank the greater Green Bay community for supporting the 2022 Referendum.

Southwest Baseball played East/West while Southwest Softball played Pulaski High School on April 9, 2024.

Southwest Updates

Thanks to the 2022 Referendum, Southwest High School is seeing a roofing project, updated tennis courts, asphalt replacement at the stadium entrance, and the new baseball and softball diamonds. 


March 2024 Update

East Weight Room Progress

Progress is being made on the new weight room and fitness center at Green Bay East High School! Piles are in the ground to support the new space. Work is also being done regarding storm water at the high school. 


February 2024 Update

West Weight Room Progress

The walls are up for the new weight room and wrestling space at West High School! This project broke ground back in November 2023.

Preble Grandstand

The new grandstand is in at Preble High School! Stadium updates will continue this winter at Preble, including a concession stand and bathroom, which is being added near the south parking lot.


January 2024 Update

West Stadium Renderings

Renderings of the future stadium at Green Bay West High School have been created, and we're now getting a glimpse into what the stadium may look like upon completion.

West Stadium Rendering 1
West Stadium Rendering 2
West Stadium Rendering 3
West Stadium Rendering 4
West Stadium Rendering 5
West Stadium Rendering 6

December 2023 Update

West Weight Room Progress

After breaking ground back in November, progress is being made on the new weight room and wrestling space at Green Bay West High School! This project is one of many underway thanks to community support of the November 2022 Referendum.

Southwest Baseball and Softball Complex Progress

Southwest High School continues to see construction on the baseball and softball complex. The dugouts and an outbuilding for concessions/restrooms/press box have progressed.


Preble Grandstand Progress

The replacement of the grandstand at Preble High School's stadium is underway. The previous grandstand was removed to make way for a 2000+ seat grandstand and a new press box. The grandstand seats are currently in place. A concession stand and bathroom building will be added near the south parking lot. The track is also ready for spring, with all the lines and markings complete.



November 2023 Update

Southwest Baseball and Softball Complex Progress 

Construction continues on new turf baseball and softball fields at Southwest High School. The foundation has been laid for the dugouts and the concessions/restrooms/press box building.

Preble Grandstand Progress

Replacement of the grandstand at Preble High School's stadium is underway. A 2000+ seat grandstand and a new press box will be constructed. A concession stand and bathroom building will be added near the south parking lot.

West Weight Room and Wrestling Groundbreaking

Students, staff and community stakeholders broke ground on the future West High School weight room and wrestling space on November 1, 2023. The weight room and wrestling space are one of several West High School projects to come from the November 2022 Referendum. 


October 2023 Update

Southwest Baseball and Softball Complex Progress

Baseball and Softball fields are seeing progress at Green Bay Southwest High School!


September 2023 Update

Southwest Tennis Courts and Baseball and Softball Diamonds

Tennis courts are complete at Green Bay Southwest High School. Baseball and softball diamonds are currently under construction.

Preble Soccer Debut on New Turf Field

Green Bay Preble High School varsity soccer coach Chris Becker wants to thank the greater Green Bay community for supporting the 2022 Referendum and Preble stadium upgrades. Preble Soccer made its home debut on the new turf field at Preble High School on September 14.

East Weight Room Renderings

We're getting a glimpse into what the new East High School fitness center and weight room may look like thanks to these renderings.

East Weight Room Interior 2
East Weight Room Interior Rendering 1
East Weight Room Exterior Rendering 2
East Weight Room Exterior Rendering 1

August 2023 Update 

Progress Statuses


Referendum Project Statuses (August 28, 2023)

West Weight Room Renderings

We're getting a glimpse into what the new West High School weight room and wrestling space may look like upon completion.

West Weight Room Rending 3
West Weight Room Rending 2
West Weight Room Rending 1
West Wrestling Room Rendering

 


July 2023 Update


June 2023 Update


May 2023 Update

Referendum Project Status List (May 23, 2023


April 2023 Referendum Update

View April 2023 Referendum update in English  |  View April 2023 Referendum Update in Spanish
 


Note to contractors: Use this link for questions regarding current bids, etc. 

Proposed Timeline

(subject to change/some projects are delayed until 2024 as they may be impacted by the Facility Master Plan work):

2023 

  • East Fire Alarm System
  • Preble Stadium Renovations
  • East Renovations (continuing into 2024)
  • Southwest Baseball Field
  • Southwest Auditorium Sound System
  • ASB Renovations and Expansion
  • Edison Renovations (continuing into 2024)
  • Edison Track and Long Jump
  • Franklin Roof Replacement
  • Jackson Playground
  • JDAL HVAC System
  • Preble Parking Lot
  • Red Smith Asphalt
  • Southwest Tennis Courts
  • Pedestrian Signage
  • Red Smith Cooler and Freezer
  • Washington Orchestra

2024

  • Franklin Renovation
  • Preble Renovation (continuing into 2025)
  • Southwest Renovation
  • Sullivan HVAC and Windows
  • Lombardi Renovation
  • West Stadium
  • Howe HVAC
  • West Renovation
  • Aldo Playground
  • Kennedy Playground
  • Danz Playground
  • East Tennis Courts
  • Sullivan Playground
  • Washington Roof
  • West Roof
  • Lombardi/King Solar Array